01Sponsor
02Documentation
03System access
04Secure channel
05Diagnostic
06Decision-makers
Priority 1

An identified executive sponsor

A decision-maker on the board or executive team, able to arbitrate on scope and budget.

Why: Without one, scoping workshops go in circles and nothing gets decided between meetings.

Priority 2

Existing documentation gathered

Mapping, diagrams, vendor contracts, application inventory — even partial or outdated.

Why: It avoids starting from zero on what's already known, saving several days from the first workshop.

Priority 3

Read access to key systems

Restricted access to the tools, repositories and dashboards needed for the audit or diagnostic.

Why: The analysis is based on facts, not claims — access determines the quality of the diagnostic.

Priority 4

A secure exchange channel

Proton Mail & Drive for sensitive documents, rather than plain email or unencrypted sharing.

Why: Security and data sovereignty from the preparatory phase, GDPR compliance from day one.

Priority 5

A diagnostic or scoping already started

The site's maturity diagnostic or scoping questionnaire, filled in beforehand.

Why: The first conversation starts on substance rather than discovery questions.

Priority 6

Decision-makers identified for the workshops

CIO, CISO, relevant business leads — who needs to be in the room, and for which decisions.

Why: A workshop without the right people produces meeting notes, not decisions.

Confidentiality from the first exchange

An encrypted channel for sensitive documents

Mapping, contracts, system access: these documents should never travel over unencrypted email. Proton Mail and Proton Drive cover nearly every exchange needed during a scoping engagement — no additional tooling required to get started.

Prerequisites in place?

Let's move on to scoping the need and the first workshop.